Water: Access to potable water

Supply projects ensuring access to potable water, contributing to improved quality of life.

Universalization Program for Basic Sanitation of
the Paraopeba Basin.

Public manager, check here for information about the Paraopeba Sanitation Program.

To join the Paraopeba Sanitation Program, the municipality will need to:

  • Return the signed transfer agreements to BDMG within 30 days after receiving them from the Bank;
  • Register with BDMG Digital;
  • Establish the Program Management.

The submission of projects is conditional upon joining the Program.

Funds can be allocated for the following purposes:

  1. Sanitary sewage systems,
  2. Water supply systems,
  3. Urban macro-drainage (limited to 25% of the resources),
  4. Solid waste collection, disposal, and treatment (exclusive to Brumadinho).

Important:

  • Projects must be included in the Municipal Basic Sanitation Plan (PMSB).
  • The review or development of the PMSB may be supported with Program resources.
  • The municipality may use Technical Support in all stages of the Program.
  • The deadline for project approval is 07/15/2026.
  • Funds cannot be allocated for direct execution of the works.
  • The works must be carried out on land owned by the municipality.
  • The municipality may use Program resources to regularize land where the Program works will be executed.
  • Resources may be obtained for new paving or reconstruction related to the functionality of the work, limited to 10% of its value.
  • The purchase of vans, motorcycles, agricultural machinery, or used equipment is not allowed.
Works

The municipality that has entered into the transfer agreement with BDMG must submit the project to be executed to the Bank.
The following documents must be sent via BDMG Digital:

  • Descriptive Report, following the guidelines in the project guide below:
    Click here
  • Drawings – CAD
  • Drawings – Scanned
  • SPB – BDMG Spreadsheet System (Project), following the model below:
    Click here
  • Project Spreadsheets: (Calculation Memory, BDI, Budget, Schedule, Quotes (if any), Composition (if any), and Location)
  • Photographic Report
    Click here
  • ART – Project Development
  • ART – Budget Development
  • ART – Fire and Panic Safety Project Development (if any)
  • Property Title – Property Registration (if any)
  • Environmental Regularization
  • Declaration of compliance with accessibility standards for architectural and urbanistic works (if any), following the model below:
    Click here
  • Declaration of structural capacity of the existing building (if any), following the model below:
    Click here
  • Declaration that roads will meet hydraulic conditions for proper rainwater drainage (if any), following the model below:
    Click here
  • Declaration of compliance with the Municipal Basic Sanitation Plan – PMSB (if any), following the model below:
    Click here
  • Declaration of compliance with the Integrated Solid Waste Management Plan – PGIRS (if any), following the model below:
    Click here
  • Declaration of compliance with technical standards for Sanitary Sewage Systems (if any), following the model below:
    Click here
  • Declaration of compliance with NBR 9648 – Sanitary Sewer System Concept Study (if any), following the model below:
    Click here
  • Declaration of compliance with NBR 8419 – Urban Solid Waste Landfill Project (if any), following the model below:
    Click here
  • Declaration of Land Registration Link to the Project Area (if any), following the model below:
    Click here

After verification and approval of the submitted information, BDMG will issue the Authorization to Begin Works.

Acquisition of Machinery and Equipment​

Funds can be allocated for the acquisition of machinery, equipment, and vehicles, provided they are connected to the purpose of the Program and complement or enhance the functionality of the implemented sanitation systems.

At this stage, municipalities must specify the assets to be acquired, accompanied by a justification for their acquisition, as well as the investment value, via BDMG Digital.

After verification and approval of the submitted information, BDMG will issue the Authorization to Begin Works.

Studies, Plans, and Development of Engineering Projects​

Funds can be allocated for the preparation or review of the PMSB (Municipal Basic Sanitation Plan), PRAD (Degraded Area Recovery Plan – only for Brumadinho), and the development of engineering projects.

At this stage, municipalities must specify the intended use of the funds, accompanied by a justification and the investment amount, via BDMG Digital.

After verification and approval of the submitted information, BDMG will issue the Authorization to Begin Works.

Land Acquisition​

Funds can be allocated for the acquisition of land and/or compensation for easement strips where works related to the Program’s objectives will be executed.

At this stage, municipalities must specify the land and/or easement strips, as well as the investment amount, via BDMG Digital.

After verification and approval of the submitted information, BDMG will issue the Authorization to Begin Works.

The bidding process must only be conducted after the issuance of the bidding authorization sent by BDMG.

It is the sole responsibility of the Municipality to comply with the applicable legislation and ensure the regularity of the bidding and contracting procedure. BDMG shall not bear any responsibility for this process under any circumstances.

The bidding must comply with the requirements of Law No. 14.133/2021 (or Law No. 13.306/2016, in the case of a public company).

Works​

After the conclusion of the bidding process, the client must submit the documents listed below via BDMG Digital.

  • Service Contract
  • Approval
  • Awarding
  • Bidding Spreadsheets (schedule, budget, and location)
  • Contract Publication
  • Declaration of Compliance with Law No. 14.133/2021, as per the model below:

Annex I – Bidding Process Result and Declaration of Compliance with Law 14.133-21

Click here

Annex II – Bidding Process Exemption and Declaration of Compliance with Law 14.133-21

Click here

  • SPB – BDMG Spreadsheet System (Bidding)

Available on BDMG Digital at: “My Projects” > “View Details” > “View Documentation” > “SPB Spreadsheet – BDMG”

  • Bidding Spreadsheets – Budget

After completing the SPB spreadsheet, click on “2.5 Print Bidding”

  • Bidding Spreadsheets – Schedule

After completing the SPB spreadsheet, click on “2.5 Print Bidding”

  • Ordinance Appointing the Management Team Members

Click here

Acquisition of Machinery and Equipment

After the conclusion of the bidding process, the client must submit the documents listed below via BDMG Digital.

  • Asset Acquisition Contract
  • Approval
  • Awarding
  • Bidding Spreadsheets (schedule, budget, and location)
  • Contract Publication
  • Declaration of Compliance with Law No. 14.133/2021, as per the model below:

Annex I – Bidding Process Result and Declaration of Compliance with Law 14.133-21

Click here

Annex II – Bidding Process Exemption and Declaration of Compliance with Law 14.133-21

Click here

*The documents must be submitted via BDMG Digital within the contract’s stipulated deadline.

Studies, Plans, and Development of Engineering Projects

After the conclusion of the bidding process, the client must submit the documents listed below via BDMG Digital.

  • Service Contract
  • Approval
  • Awarding
  • Bidding Spreadsheets (schedule, budget, and location)
  • Contract Publication
  • Declaration of Compliance with Law No. 14.133/2021, as per the model below:
  • Annex I – Bidding Process Result and Declaration of Compliance with Law 14.133-21
  • Click here
  • Annex II – Bidding Process Exemption and Declaration of Compliance with Law 14.133-21
  • Click here

*The documents must be submitted via BDMG Digital within the contract’s stipulated deadline

Land Acquisition

For land acquisition, the client must submit the documentation listed below via BDMG Digital.

  1. Conventional Purchase and Sale:
    • Land appraisal report prepared by a qualified professional.
    • Declaration of compliance with Law 8.666 or 14.133.
    • Approval and awarding term, in case of a bidding process.
    • Justification for exemption/inexigibility of bidding, if applicable.
    • Publication of the ratification of exemption or inexigibility, in cases of exemption and inexigibility of bidding.
    • Proof of partial payment of the property’s value and/or indication of the corresponding budgetary allocation.
  2. Expropriation with Agreement between the Parties:
    • Land appraisal report prepared by a qualified professional.
    • Municipal decree, municipal law, or other normative act declaring the area of public utility.
    • Proof of partial payment of compensation (with public budget resources) and/or indication of the law or budgetary allocation corresponding to the payment to be made.
    • Public deed of the property, private expropriation agreement, or property certificate with updated registration (issued within the last 30 days, to confirm the compensation beneficiary).
  3. Expropriation with Agreement between the Parties – Easement Strips:
    • Municipal decree, municipal law, or other normative act declaring the area of public utility.
    • Executed public deed, expropriation agreement, or property certificate with updated registration (issued within the last 30 days).
    • Proof of partial payment of compensation (with public budget resources) and/or indication of the law or budgetary allocation corresponding to the payment to be made.
  4. Judicial Expropriation – Land:
    • Land appraisal report prepared by a qualified professional.
    • Municipal decree or municipal law, or other normative act declaring the area of public utility.
    • Declaration of acknowledgment by the municipality that all responsibilities determined in the final judgment are the proponent’s responsibility.
    • Property certificate with updated registration (to confirm the compensation beneficiary).
    • Proof of court deposit of the determined amount.
  5. Judicial Expropriation – Easement Strip:
    • Municipal decree or municipal law, or other normative act declaring the area of public utility.
    • Public deed of the property.
    • Appraisal report of the property and the easement to be established, prepared based on ABNT 14.653.
    • Declaration of acknowledgment by the municipality that all responsibilities determined in the final judgment are its responsibility.

Attention! BDMG does not provide reimbursements. 

To receive the funds, the client must also ensure:

✓ That formal authorization from BDMG has been granted for the issuance of the service order

✓ Accountability for previously released funds, if applicable

✓ The absence of technical and/or economic-financial issues that, at BDMG’s discretion, may compromise the execution of the supported project, thereby altering or preventing its implementation

✓ The regular progress of the project, in accordance with the schedule submitted to BDMG.

Works

For approval and receipt of the funds, the municipality must submit the documentation listed below via BDMG Digital.

  • Service Order Issued by the Municipality (1st Measurement)
  • Official Request for Fund Release

Click here

  • SPB – BDMG Spreadsheet System (Measurement)

Obtained through BDMG Digital at: “My Projects” > “View Details” > “Biddings” > “View Details” > “Latest Approved SPB”

  • Measurement Spreadsheets – Measurement

After completing the SPB spreadsheet, click on: “3.4 Print Measurement” and select the necessary options.

  • Measurement Spreadsheets – Location (Paving, Drainage, or Sanitation)

After completing the SPB spreadsheet, click on: “3.4 Print Measurement” and select the necessary options.

  • Photographic Report

Click here

  • Invoice for the financed part
  • Commitment Note for the financed part
  • Invoice for the counterpart (if applicable)
  • Commitment Note for the counterpart (if applicable)
  • Proof of payment for the counterpart (if applicable)
  • Work Acceptance Term (Final Measurement)

Click here

Acquisition of Machinery and Equipment

“`html

For approval and receipt of funds, after acquiring the asset, the municipality must submit the documentation listed below via BDMG Digital.

  • Invoices and Commitment Notes for the financed part
  • Invoices and Commitment Notes for the counterpart (if applicable)
  • Official Request for Funds

Click here

  • Declaration of bank account opening, as per the model:

Click here

  • Photographic Report, as per the model:

Click here

  • Declaration of receipt of equipment

Click here

  • Technical Report

Click here
“`

Studies, Plans, and Development of Engineering Projects

For approval and receipt of funds, the municipality must submit the documentation listed below via BDMG Digital.

  • Service order issued by the proponent at the start of the contract (only for the first measurement submission)
  • ART from the responsible engineer with compatible service, signed
  • Commitment note
  • Invoice issued by the service provider
  • Declaration of specific account opening
  • Official request for fund release

PMSB

  • Declaration of compliance with Laws 11.445/2007, 14.026/2020, and 12.305/2010
  • Social mobilization plan
  • Technical-participatory diagnosis report: diagnosis of the situation of basic sanitation services and their impacts on living conditions, using indicators of sanitation, epidemiology, environment, and socioeconomics, identifying the causes of detected deficiencies.
  • Prospective and strategic planning report: objectives and short, medium, and long-term goals for universalization, allowing for gradual and progressive solutions, ensuring compatibility with other sectoral plans.
  • Programs, projects, and actions report: necessary programs, projects, and actions to achieve objectives and goals, compatible with multi-year plans and other related government plans, identifying potential funding sources.
  • Execution plan.
  • Draft of the PMSB law project.
  • Performance indicators report: mechanisms and procedures for systematic evaluation of the efficiency and effectiveness of the programmed actions and plan review.
  • Information system.

PGIRS

  • Diagnosis of the solid waste situation in the respective territory, including origin, volume, characterization of waste, and methods of disposal and final destination.
  • Identification of suitable areas for environmentally appropriate final disposal of waste, in compliance with the master plan described in §1º of art. 182 of the Federal Constitution and environmental zoning, if any.
  • Identification of possibilities for implementing consortium or shared solutions with other municipalities, considering economic scale criteria, proximity of established locations, and prevention of environmental risks.
  • Identification of solid waste and generators subject to specific management plans under art. 20 or reverse logistics systems under art. 33, complying with this law, its regulations, and standards set by SISNAMA and SNVS bodies.
  • Operational procedures and minimum specifications for public urban cleaning and solid waste management services, including appropriate final waste disposal, in accordance with Law nº 11.445, 2007.
  • Operational and environmental performance indicators for public urban cleaning and solid waste management services.
  • Rules for transportation and other stages of solid waste management mentioned in art. 20, following standards established by SISNAMA and SNVS bodies and relevant federal and state legislation.
  • Definition of responsibilities for implementation and operation, including public responsibilities for solid waste management plan stages under art. 20.
  • Programs and actions for technical training aimed at implementation and operation.
  • Programs and actions for environmental education promoting waste prevention, reduction, reuse, and recycling.

PRAD

  • Work plan
  • Topographical/cadastral survey indicating watercourses, wells or cisterns, and existing structures within a 500m radius.
  • Geological/geotechnical/hydrological characterization of the area.
  • Simplified environmental diagnosis, describing physical and socioeconomic aspects of the area surrounding the landfill.
  • Characterization of surface and groundwater in at least two points, upstream and downstream of the landfill.
  • Recovery process proposals, including guidance for:
    • geometric reconformation services;
    • landfill sealing;
    • stormwater drainage;
    • gas drainage;
    • leachate drainage and treatment;
    • vegetation cover and area isolation.
  • Definition of future use alternatives for the area.
  • Definition of a monitoring program for:
    • mass stability;
    • maintenance of drainage systems (stormwater, gas, and leachate);
    • quality of surface and groundwater;
    • growth and control of vegetation cover;
    • signage and area isolation systems.
  • Estimated costs and execution schedule.
  • Photographic report of the degraded or disturbed area.
  • PRAD monitoring periodicity.
Land Acquisition

For approval and receipt of funds, the municipality must submit the documentation listed below via BDMG Digital.

  • Property certificate with updated registration (to confirm the payment beneficiary).
Contract Addendums

Below is the documentation for submitting addendums:

Deadline Extension Addendum

Addendum required to maintain the validity of the service provider’s contract.

  • Amendment Agreement
  • Publication of the Amendment Agreement
  • Technical Opinion from the Municipality
  • Notification of deadline extension and declaration of compliance with Law 8.666/93 or Law 14.133/21, as per the model below:

Click here

  • SPB – BDMG Spreadsheet System: Obtained via BDMG Digital at: “My Projects” > “View Details” > “Biddings” > “View Details” > “Latest Approved SPB”
  • Amendment Spreadsheet – Schedule

Quantity Addition and/or Reduction Addendum

Executed when changes to the quantities specified in the contract are required.

  • Amendment Agreement
  • Publication of the Amendment Agreement
  • Technical Opinion
  • Notification of the addendum and declaration of compliance with Law 8.666/93 or Law 14.133/21, as per the model below:

Click here

  • SPB – BDMG Spreadsheet System: Obtained via BDMG Digital at: “My Projects” > “View Details” > “Biddings” > “View Details” > “Latest Approved SPB”
  • Amendment Spreadsheets – Budget, Schedule, Calculation Memory, and Location

Adjustment Addendum

Executed to adjust the financial values established in the contract according to the pre-agreed index.

  • Amendment Agreement
  • Publication of the Amendment Agreement
  • Technical Opinion
  • Notification of the addendum and declaration of compliance with Law 8.666/93 or Law 14.133/21, as per the model below:

Click here

  • SPB – BDMG Spreadsheet System: Obtained via BDMG Digital at: “My Projects” > “View Details” > “Biddings” > “View Details” > “Latest Approved SPB”
  • Amendment Spreadsheets – Budget, Schedule, Calculation Memory, and Location

Financial Rebalancing Addendum

Executed when unforeseen events or changes in contractual conditions significantly impact the project execution costs.

  • Amendment Agreement
  • Publication of the Amendment Agreement
  • Technical Opinion
  • Notification of the addendum and declaration of compliance with Law 8.666/93 or Law 14.133/21, as per the model below:

Click here

  • SPB – BDMG Spreadsheet System: Obtained via BDMG Digital at: “My Projects” > “View Details” > “Biddings” > “View Details” > “Latest Approved SPB”
  • Amendment Spreadsheets – Budget, Schedule, Calculation Memory, and Location

Frequently Asked Questions

To enable your Municipality to access Program funds, follow the steps below:

  1. Signing and Returning Contracts: Sign, publish, and send the contracts via email to paraopebasaneamento@bdmg.mg.gov.br.
  2. Establishment of the Program Management: Establish the Program Management according to the guidelines in the notice.
  3. Registration on BDMG Digital: Register the Municipality on the BDMG Digital platform using this link https://wwws.bdmg.mg.gov.br/bdmg-digital/login

After completing these steps, the Municipality will be eligible to submit projects and access the available funds.

For more information, consult the full notice here.

The available amount for each municipality can be found in the notice. To check, click here.

Only the Mayor of the Municipality can register for the Program by following the steps below:

  1. Signing and Returning Contracts: Sign, publish, and send the contracts via email to paraopebasaneamento@bdmg.mg.gov.br.
  2. Establishment of the Program Management: Establish the Program Management according to the guidelines in the notice.
  3. Registration on BDMG Digital: Register the Municipality on the BDMG Digital platform using this link https://wwws.bdmg.mg.gov.br/bdmg-digital/login

No. The Program funds are compensatory and result from a Judicial Agreement; therefore, authorization from the legislative council is not required for signing.

Yes. The Paraopeba Sanitation Program was created as compensation for the damages caused by the collapse of the Córrego do Feijão dams in Brumadinho and ensures that affected municipalities are entitled to receive funds, provided they meet the conditions outlined in the Notice.

Receiving these funds does not affect the municipalities’ debt level or financial commitments with the Bank or within the financial system.

The Program’s funds originate from the Judicial Agreement regarding known environmental damages to the Paraopeba River, caused by the collapse of the Córrego do Feijão dams in Brumadinho.

A total of R$ 1.47 billion has been allocated for the universalization of basic sanitation in the 26 affected municipalities.

Additional resources amounting to R$ 10.8 million have been allocated to support municipalities in developing engineering projects, along with R$ 18.4 million for contracting Technical Support.

  1. Sanitary sewage systems
  2. Water supply systems
  3. Urban drainage (limited to 25% of the total available amount)
  4. Urban solid waste management systems (exclusively for Brumadinho)

The Program’s funds can be used for projects related to basic sanitation actions, including:

  • Development of engineering projects;
  • Technical consulting;
  • Execution of works;
  • Acquisition of machinery, equipment, and land necessary for project implementation.

It is important to note that direct execution of works and reimbursement of expenses already incurred with the Municipality’s own funds are not supported.

Yes, provided these expenses are linked to the objectives of the Program. This means they must be allocated to the execution of basic sanitation works and projects previously approved by BDMG, even if those works are financed by other funding sources.

Yes, provided the paving is related to the sanitation project and ensures the functionality of the work approved by BDMG. Additionally, spending on this item is limited to 10% of the total amount to be invested. Any excess amount must be covered with the Municipality’s own funds.

Items not related to the objectives of the PROGRAM, as determined by the FINANCIAL AGENT, as well as the following, will not be supported:

  • Vans
  • Motorcycles
  • Agricultural machinery
  • Any used equipment or machinery
  • Expenses related to modeling for the concession of sanitation services

Anyone duly authorized by the mayor to access BDMG Digital on behalf of the municipality.

The project can be submitted as soon as the following steps are completed:

  1. Signing and Returning Contracts: Sign, publish, and send the contracts via email to paraopebasaneamento@bdmg.mg.gov.br.
  2. Establishment of the Program Management: Establish the Program Management according to the guidelines in the notice.
  3. Registration on BDMG Digital: Register the Municipality on the BDMG Digital platform using this link https://wwws.bdmg.mg.gov.br/bdmg-digital/login

It is important to note that submitted projects must be part of the current Municipal Basic Sanitation Plan or must be integrated into the Plan under revision.

Yes, the funds can be applied through consortia, with delegation from the municipality.

For detailed information on the procedures to be followed, please contact BDMG via email at paraopebasaneamento@bdmg.mg.gov.br.

Yes, provided they are authorized by the municipality. The authorization must specify which projects will be executed and the maximum amount that can be transferred to the concessionaire.

The projects must be completed and the funds disbursed to the municipalities within 60 months, starting from 16/07/2024.

For the funds to be used within this period, the projects must be approved by BDMG by 15/07/2026.

If the municipality does not use the available funds within the stipulated deadline, the funds will be redistributed among the other municipalities covered by the Program. The redistribution criteria will be defined by the parties of the Agreement that originated the Program, prioritizing the indices and deficits of sanitation services, as per the criteria established in Law 14.026/2020.

If the funds are used by the municipality for purposes other than those outlined in the Program, BDMG will notify the State Secretariat for the Environment and Sustainable Development (SEMAD) about possible misapplications.

If technical non-compliance is confirmed, the following measures will be applied:

  1. Cancellation of the remaining balance to be released;
  2. Return of already released funds;
  3. Application of legal penalties;
  4. Other penalties that may be determined by the Parties involved in the Agreement.

It is specialized consulting to support the municipality’s team in all stages and procedures necessary for the execution of the Program.

No. All activities performed by Technical Support are funded with resources from the Agreement. These are additional resources to those each municipality is entitled to.

BDMG is responsible for managing Technical Support, including personnel allocation, quality verification, and payment for the services provided.

You just need to send an email to apoiotecnico@bdmg.mg.gov.br, indicating the product and purpose.
See the available services at the link.

Click here to learn more.

The Municipality may request Technical Support at any time after joining and for any of the purposes provided in the Program.
See the available services at the link.

Contact us

How would you prefer to contact us?

contato BDMG

Talk to BDMG

(31) 3219-8000

For those who are not yet clients and want to learn more about the bank, our products and also about the progress of a request for funding.

Phone number for clients

0800 283 8337

For you who already are our client and have contracted a credit line.

Address:

Rua da Bahia, 1600

Lourdes - Belo Horizonte / MG

Zip Code 30160-907

Mapa mostrando a localização do BDMG na Rua da Bahia, 1600, Centro, Belo Horizonte, MG.

Access documents to
BDMG clients

Find necessary documents, such as License Plate Models, Fee and Reimbursement Tables, and others.