Mobilidade

I) Implementation, expansion, and/or adaptation of urban roads, overpasses, pedestrian bridges, exclusive lanes, sidewalks, bike lanes, public squares, traffic signage, and shelters at urban public passenger transport stops.
II) Paving of urban roads already served by water and sewage services, or whose services are included in the project.
IV) Landscaping, urban tree planting, and green corridors to reduce heat islands.
V) Expansion and/or adaptation of rural roads, which may include bike lanes, bridges, overpasses, interchanges, roundabouts, signage, and shelters at public passenger transport stops.

Check out more updates on the 2025 Municipalities Notice:

More savings icon

Cost: from 0.33% p.m. + Selic for municipalities with an HDI equal to or lower than the average of municipalities in MG, and 0.41% p.m. + Selic for all others.

More planning icon

Term: Up to 96 months, including up to 18 months of grace period.

More agility icon

Contracting and fund disbursement in a fast and 100% digital process.

More support icon

Technical assistance in the financing contracting process.

More flexibility icon

Once the bidding process is completed, the municipality will already have 40% of the amount released for infrastructure investment.

See how BDMG credit is transformed into development for the people of Minas Gerais.

Do you know what these residents of cities in Minas Gerais have in common? All of them benefited from projects financed through the BDMG Municipalities Call for Proposals.

Public Manager, check out the information about the 2025 Municipalities Notice here.
  • Beneficiaries: municipal governments of Minas Gerais
  • Budget: R$ 500 million
  • Schedule:
    STAGE DEADLINE RESPONSIBLE PARTY
    1 Submission of the Proposal through the BDMG Digital platform By 03/20/2026 Municipality
    2 Qualification of the Digital Proposal By 04/02/2026 BDMG
    3 Submission of the municipal authorizing law related to the financing and documents for preparation of the PVL By 04/30/2026 Municipality
    4 PVL filing with SADIPEM/STN By 05/29/2026 Municipality
    5 Execution of the Financing Agreement 30 days after contract issuance Municipality
    6 Submission of the first engineering construction project 90 days from contract issuance Municipality
    7 Submission of the first machinery bidding process 90 days from contract issuance Municipality
    8 Submission of the construction bidding process Up to 120 days after authorization to bid Municipality
    9 Disbursements and Monitoring According to the BDMG contract schedule BDMG
    Municipality
  • Registration

    Registrations must be made exclusively on the BDMG website, in the “Access your BDMG Digital” area. After submitting the information requested on the platform, a “confirmation” message will be displayed. This means that the proposal has been correctly registered and is already under review. There is no need to contact BDMG by phone or email for confirmation. Submission must be completed by the deadline set forth in the Call for Proposals.

    If the Municipality does not have a registration on the portal, it must complete it at this link.

    Attention! The contracting of credit operations will be subject to the availability of the annual global credit limit for public sector bodies and entities, in accordance with Central Bank Resolution No. 4,589 of March 24, 2022.

Acesse o vídeo e veja como é simples enviar a proposta de financiamento!

Now, BDMG will analyze your financing request.

Carefully read the Call for Proposals to learn about the available credit lines and the general eligibility rules.

Conditions for proposal eligibility

  • a) Be up to date with accounting reports approved in the Siconfi, Sicom, and Cauc systems.
  • b) Debt capacity of the applicant.
  • c) Compliance with the Legal Limits set forth in the Federal Constitution, especially Article 167-A, the Fiscal Responsibility Law, and Senate Resolutions No. 40 and 43 of 2001, including those related to personnel expenses.
  • d) Eligibility of the object to be financed, in accordance with BDMG rules.
  • e) No registration or financial restrictions or relevant pending issues with Bacen, SPC, Serasa, or BDMG itself.
  • f) No pending issues in previous projects financed by BDMG.
  • g) For eligibility, the monthly installment amount may not exceed 50% of the municipality’s average monthly ICMS revenue as calculated in the most recent required financial statement.

How we will contact the municipality after the proposal analysis

The municipality will be able to check the status of its proposal on the BDMG website and will receive the Eligibility Term at the registered email addresses.

The Eligibility Term determines the successful completion of the first stage of the application and is a requirement, together with the authorizing law, to begin the process of approval of the Request for Verification of Limits and Conditions (PVL) of the credit operation by the National Treasury Secretariat (STN).

During the proposal analysis, pending issues may be opened for clarification or correction of submitted information. In such cases, the registered contacts will be notified by email. The municipality may also regularly check BDMG Digital so that pending issues can be resolved in a timely manner.

Once your proposal is deemed eligible, BDMG will support your municipality so that the request is properly submitted to the National Treasury Secretariat (STN).

The contracting of credit operations by States, the Federal District, and Municipalities, including their Autarchies, Foundations, and Dependent State-Owned Enterprises, is subject to the rules of the Federal Constitution, especially Article 167-A, Complementary Law No. 101 of May 4, 2000 (Fiscal Responsibility Law – LRF), and Senate Resolutions No. 40 and 43 of 2001.

The documentation required by the National Treasury Secretariat (STN), an agency of the Ministry of Finance, and the procedures to obtain a favorable opinion on the Request for Verification of Limits and Conditions (PVL) are described in the Manual for Submitting Requests (MIP), made available by the National Treasury Secretariat.

BDMG will support the municipality to ensure that the documentation required by the STN is provided promptly and in full, meeting the legal and operational prerequisites observed by the STN in its analyses.

After BDMG sends the Eligibility Term, the entity must submit the documents below:

Name Download
Authorizing law template and other documents. DOWNLOAD

Authorizing Law

BDMG provides municipalities with templates of authorizing laws for approval by the City Council. As conditions vary for each financing line in the Call for Proposals, one law must be approved for each municipal request. If any modification to the authorizing law template is required, a prior consultation with BDMG must be made by sending an email to bdmgmunicipio@bdmg.mg.gov.br.

Approval of Accounting Reports

The entity must approve accounting reports in Siconfi as requested by the National Treasury Secretariat (STN).

Click here to access

Report Period Deadline
RREO 1st two-month period Mar 30
Annual balance sheet Previous fiscal year Apr 30
RGF 1st four-month period May 30
RREO 2nd two-month period May 30
RGF 1st semester Jul 30
RREO 3rd two-month period Jul 30

Click the video to learn how to submit the documentation:

After the Request for Verification of Limits and Conditions (PVL) is approved, the financing agreement will be issued. Be sure to carefully read the Call for Proposals to learn about the available credit lines and the general rules for contracting.

The contracting of the credit operation is subject to:

  • Availability of the annual global credit limit for public sector bodies and entities, pursuant to Central Bank Resolution No. 4,995 of March 24, 2022;
  • The applicant’s debt capacity: approval of the Request for Verification of Limits and Conditions (PVL) for the credit operation;
  • Credit and risk analysis of the municipality, according to BDMG’s criteria;
  • The municipality’s registration status being in good standing;
  • The municipality’s technical and financial compliance with BDMG.

Pending registration issues with Siafi/MG, Cadip, Sahem, FGTS, State Revenue, Federal Revenue, and Cauc prevent contracting and the release of funds.

The date the financing agreement is issued by BDMG will be used to count the grace and amortization periods. Signing the financing agreement does not guarantee the release of the scheduled installments, which remains subject to compliance with and fulfillment of the provisions set forth in the financing agreement.

Name Download
Template – mandatory contract documents – housing scope DOWNLOAD
Template – mandatory contract documents – other financing scopes DOWNLOAD

Watch the step-by-step guide
and learn how to upload
the documents to the platform:

PROJECTS AND WORKS

The project must be submitted within 90 (ninety) days, counted from the date of issuance of the financing agreement.

This deadline may be extended once, for an additional 90 (ninety) days, upon payment of a Credit Reservation Fee¹.

¹ The payment slip may be issued through BDMG Digital.

The following documents must be submitted via BDMG Digital:

Name Template
Descriptive memorandum, in accordance with the guidelines of the Project Guide
Project guide Download
CAD drawings
Drawings – scanned
SPB – BDMG Spreadsheet System (Project) Download
Project spreadsheets: Calculation Memo, BDI, Budget, Schedule, Quotation (if applicable), Composition
(if applicable), and Location (Paving, Drainage, and/or Sanitation)
Photographic report Download
ART – Project Preparation
ART – Budget Preparation
ART – Fire and Panic Prevention Project Preparation (when applicable)
Land Ownership – Property Registration (when applicable)
Environmental Regularization
Declaration of compliance with accessibility standards in architectural and urban works
(when applicable)
Download
Declaration of structural capacity of the existing building (when applicable) Download
Declaration that the roads will present adequate hydraulic conditions for proper stormwater runoff
(when applicable)
Download
Declaration of compliance with the Municipal Basic Sanitation Plan — PMSB (when applicable) Download
Declaration of compliance with the Integrated Solid Waste Management Plan — PGIRS (when applicable) Download
Declaration of compliance with technical standards for Sanitary Sewage Systems (when applicable) Download
Declaration of compliance with NBR 9648 — Conceptual Study of Sanitary Sewage Systems
(when applicable)
Download
Declaration of compliance with NBR 8419 — Urban Solid Waste Sanitary Landfill Design
(when applicable)
Download
Declaration of linkage between the property registration and the project area (when applicable) Download

For municipalities that will finance the preparation of the project.

For Project Preparation financing, the following documents must be submitted via BDMG Digital:

Name Template
Project guide Download
Project spreadsheet Download
Budget spreadsheet
Schedule spreadsheet
(when applicable)

MACHINERY, VEHICLES, AND EQUIPMENT

Within 90 (ninety) days, counted from the date of issuance of the financing agreement, the client must inform, via BDMG Digital, the assets to be acquired, together with the justification for their acquisition, as well as the amount of the financed investment.

After verification of the submitted information, BDMG will issue the authorization to proceed with the bidding process.

PROJECTS AND WORKS

For receipt of the first installment of funds and issuance of the authorization to issue the notice to proceed, the client must submit the documents listed below after completion of the bidding process.

Bidding for Project Preparation does not generate advance disbursement of funds.

The following documents must be submitted via BDMG Digital:

Name Template
Service Agreement
Approval
In the event of adherence to another municipality’s or consortium’s price registration record, it is necessary to submit the Agreement to Adhere to that Record.
Award
In the event of adherence to another municipality’s/consortium’s price registration record, it is necessary to submit the Supplier’s Agreement to Supply to the holder.
SPB – BDMG Spreadsheet System (Bidding)
Available in BDMG Digital at: “My Projects” > “View Details” > “View Documentation” > “SPB-BDMG Spreadsheet”
Bidding spreadsheets: Budget, Schedule, and Location (Paving, Drainage, and/or Sanitation)
After completing the SPB spreadsheet, click “2.5 Bidding Printout” and select the required options.
Contract publication – PNCP
Declaration of Compliance with Law No. 14,133/2021 – Result of the Bidding Process Download
Declaration of Compliance with Law No. 14,133/2021 – Waiver of the Bidding Process Download
Ordinance appointing the members of the Project Management Team¹ Download
Inspection ART (must include the activity: “60 – Construction Inspection”)¹
Declaration of Bank Account Opening¹ Download
Execution ART¹
Optional at the bidding stage; mandatory at the 1st progress measurement

¹For advance disbursement flow only.

*Documents must be submitted via BDMG Digital within the deadline set forth in the contract.

It is the municipality’s sole responsibility to comply with applicable legislation and ensure the regularity of the bidding and contracting procedures, and BDMG bears no responsibility for this process under any circumstances. Authorization to start construction does not guarantee the release of the scheduled installments, which remains subject to compliance with and fulfillment of the provisions of the financing agreement.

We emphasize that the bidding process must comply with the requirements of Law No. 10,520/2001 or Law No. 14,133/2021 and must be carried out only after issuance of the authorization to bid sent by BDMG.

For receipt of funds, the client must also observe:

  • No relevant registration restrictions, at BDMG’s discretion, related to the municipality;
  • Proof of fiscal compliance with Siafi-MG — Integrated Financial Administration System of the State of Minas Gerais;
  • The municipality’s good standing with the Federal Revenue Service;
  • No economic or financial events that, at BDMG’s discretion, could compromise the execution of the financed undertaking in a way that alters it or makes it unfeasible.

For municipalities that will finance the preparation of the project.

For Project Preparation financing, the following documents must be submitted via BDMG Digital:

Name Template
Project guide Download
Project spreadsheet Download
Budget spreadsheet
Schedule spreadsheet
(when applicable)
MACHINERY, VEHICLES, AND EQUIPMENT

For issuance of the Authorization for Equipment Acquisition, after completion of the bidding process, the client must submit, via BDMG Digital Municípios, within the deadline set forth in the contract, the documents listed below.

Name Template
Service Agreement
Approval
In the event of adherence to another municipality’s or consortium’s price registration record, it is necessary to submit the Agreement to Adhere to that Record.
Award
In the event of adherence to another municipality’s/consortium’s price registration record, it is necessary to submit the Supplier’s Agreement to Supply to the holder.
Contract publication
Declaration of Compliance with Law No. 14,133/2021 — Result of the Bidding Process Download
Declaration of Compliance with Law No. 14,133/2021 — Waiver of the Bidding Process Download

*Documents must be submitted via BDMG Digital within the deadline set forth in the contract.

It is the Municipality’s sole responsibility to comply with applicable legislation and ensure the regularity of the bidding and contracting procedures, and BDMG bears no responsibility for this process under any circumstances. Authorization for the invoicing of machinery or equipment will be issued after verification of the bidding process and does not guarantee the release of the scheduled installments, which remains subject to compliance with and fulfillment of the provisions of the financing agreement.

We emphasize that the bidding process must comply with the requirements of Law No. 10,520/2001 or Law No. 14,133 of 2021 and must be carried out only after issuance of the authorization to bid sent by BDMG.

PROJECTS AND WORKS

After authorization to start the construction, the municipality will receive the percentage of the advance of the bid amount provided for in the contract.
To be entitled to the next installment, the client must demonstrate the application of at least 80% of the amount released by BDMG.
Proof of the application of released funds must be submitted within 6 months of their receipt.

The documentation required for proof, to be submitted via BDMG Digital, is as follows:

Name Template
Notice to Proceed issued by the municipality (1st Progress Measurement)
SPB – BDMG Spreadsheet System (Measurement)
Available in BDMG Digital at: “My Projects” > “View details” > “Biddings” > “View details” > “Last Approved SPB”
Measurement Spreadsheets — Measurement
After completing the SPB spreadsheet, click: “3.4 Measurement Printout” and select the required options.
Measurement Spreadsheets — Location (Paving, Drainage and/or Sanitation)
After completing the SPB spreadsheet, click: “3.4 Measurement Printout” and select the required options.
Photographic report Download
Invoice for the financed portion
Commitment Note for the financed portion
Invoice for the counterpart contribution (when applicable)
Commitment Note for the counterpart contribution (when applicable)
Works Acceptance Certificate (Final Measurement) Download
Proof of payment of the financed portion
Proof of payment of the counterpart contribution (when applicable)
Execution ART
Mandatory at the 1st measurement (for Project Preparation measurement), when not submitted during the Bidding stage
Inspection ART (for Project Preparation measurement)

Attention! For Project Preparation measurement, documents from the Construction Project stage will also be required at the measurement stage, as part of the delivery of the object. Project Preparation does not allow advance disbursement.

For receipt of funds, the client must also observe:

  • That there has been formal authorization from BDMG to start construction and/or acquire the asset;
  • Submission of accounts for previously released funds, when applicable;
  • No relevant registration restrictions, at BDMG’s discretion, related to the municipality;
  • Proof of fiscal compliance with Siafi-MG — Integrated Financial Administration System of the State of Minas Gerais;
  • The municipality’s good standing with the Federal Revenue Service;
  • No economic or financial events that, at BDMG’s discretion, could compromise the execution of the financed undertaking in a way that alters it or makes it unfeasible;
  • Regular progress of the project, in accordance with the schedule submitted to BDMG.
MACHINERY, VEHICLES, AND EQUIPMENT

After delivery of the acquired asset, the client must submit the following documentation via BDMG Digital Municípios:

 

Name Template
Invoice for the financed portion
Commitment Note for the financed portion
Official Request for Release of Funds Download
Declaration of Bank Account Opening Download
Invoice for the counterpart contribution (when applicable)
Commitment Note for the counterpart contribution (when applicable)
Photographic report Download
Declaration of receipt of equipment Download
Technical Report Download

For receipt of funds, the client must also observe:

  • That there has been formal authorization from BDMG to start construction and/or acquire the asset;
  • Submission of accounts for previously released funds, when applicable;
  • No relevant registration restrictions, at BDMG’s discretion, related to the municipality;
  • Proof of fiscal compliance with Siafi-MG — Integrated Financial Administration Financial System of the State of Minas Gerais;
  • The municipality’s good standing with the Federal Revenue Service;
  • No economic or financial events that, at BDMG’s discretion, could compromise the execution of the financed undertaking in a way that alters it or makes it unfeasible;
  • Regular progress of the project, in accordance with the schedule submitted to BDMG.
AMENDMENTS

Below are the types and the respective documentation required for submission of amendments:

  • Term Extension Amendment: amendment required to maintain the validity of the service provider’s contract;
  • Addition and/or Reduction of Quantities: carried out when there is a need to change the quantities provided for in the contract;
  • Price Adjustment Amendment: carried out to adjust the financial amounts established in the contract according to the previously agreed index;
  • Financial Rebalancing Amendment: carried out when unforeseen events occur or when changes in contractual conditions significantly affect the costs of project execution.
Name Template
Amendment Term
Publication of the Amendment Term
Technical Opinion from the Municipality
Notice of term amendment and declaration of compliance with Law No. 14,133/21 — (only for term amendments) Download
Notice of amendment and declaration of compliance with Law No. 14,133/21 — (for other amendments) Download
Legal Opinion — (mandatory for all amendments, except term amendments)
SPB — BDMG Spreadsheet System (Amendment)
Available in BDMG Digital at: “My Projects” > “View details” > “Biddings” > “View details” > “Last Approved SPB”;
Amendment Spreadsheet — Schedule — (Term Extension Amendment)
After completing the SPB Spreadsheet, click: “4.8 Amendment Printout” and select the required options.
Amendment Spreadsheet — Budget, Schedule, Calculation Memo, Quotation (when applicable), Composition
(when applicable), and Location (when applicable) — (other amendments)
After completing the SPB spreadsheet, click: “4.8 Amendment Printout” and select the required options.

 

 

Frequently Asked Questions

Projects and the purchase of new machinery and equipment may be financed, that is, investments in infrastructure, such as: paving; construction or renovation of schools, health units, and public buildings; public lighting; sanitation; culture, sports, and tourism; reconstruction of areas affected by flooding; implementation of technology to increase adaptive capacity and reduce disaster risk; creation and restoration of green areas, parks, and gardens that help absorb water and reduce flooding; implementation or replacement of existing pavement with permeable pavement; strengthening of public buildings such as hospitals, schools, and essential roads against climate disasters; etc. The resources from the Call for Proposals may not be used for municipal operating expenses, nor for reimbursement of expenses already incurred.

SUSTAINABLE CITIES – Energy efficiency projects, power generation, smart cities, and construction, expansion, and/or renovation of municipal public buildings, including culture, sports, and tourism facilities. Water supply systems, sanitary sewage, urban solid waste treatment, and sanitation projects.

INFRASTRUCTURE – Mobility works, drainage, and investments in rural roads — paving, bridges, and others.

MACHINERY AND EQUIPMENT – Road machinery and paving equipment; truck chassis; truck bodies; tractors; buses; rescue units and ambulances.

DROUGHT PREVENTION – Creation and restoration of green areas that help with water absorption and retention; reforestation actions; sanitation projects, including implementation of water supply and sanitary sewage systems.

FLOOD PREVENTION – Implementation of technology to reduce flood risks; creation of mechanisms to increase water absorption; strengthening of buildings; drainage and sanitation actions; solid waste management projects.

AMONG OTHER ELIGIBLE INVESTMENTS

Any legally designated representative of the municipal government may complete the proposal submission in BDMG Digital, except for the SCR Declaration, which must be accepted by the mayor themself. Submission must be confirmed by the deadline set forth in the Municipalities 2026 Call for Proposals.

The contract will be issued for the amount requested in the proposal, in accordance with the authorizing law and the PVL approved by the National Treasury Secretariat. If there is any change in the amount during the process, the contract will be issued with the updated amount.

The project may be submitted through BDMG Digital as soon as the financing operation has been contracted.

BDMG provides a draft bill that must be approved by the Municipal City Council and already includes the items required and verified by the National Treasury Secretariat (STN).

Yes. All 853 municipalities in the State of Minas Gerais, regardless of whether or not they have active contracts with BDMG, are eligible to submit proposals under the BDMG Municipalities 2026 Call for Proposals.

Contact us

How would you prefer to contact us?

contato BDMG

Talk to BDMG

(31) 3219-8000

For those who are not yet clients and want to learn more about the bank, our products and also about the progress of a request for funding.

Phone number for clients

0800 283 8337

For you who already are our client and have contracted a credit line.

Address:

Rua da Bahia, 1600

Lourdes - Belo Horizonte / MG

Zip Code 30160-907

Mapa mostrando a localização do BDMG na Rua da Bahia, 1600, Centro, Belo Horizonte, MG.

Access documents to
BDMG clients

Find necessary documents, such as License Plate Models, Fee and Reimbursement Tables, and others.